Capital Improvement Program FY 12/13 thru FY 16/17


Update: April 25, 2012

Public Hearing Scheduled with Board

The second public hearing on the draft CIP13-17 has been scheduled with the Lane County Board of County Commissioners (Board). The Board will hear public comments on the draft CIP at the following location and time.

Date:             Wednesday, May 9, 2012
Location:    Lane County Public Service Building
                        Harris Hall
                        125 E. 8th Avenue, Eugene
Time:            1:30 PM


The complete board packet can be viewed by clicking the links below.

   Document Name                                                    
Link
Agenda Cover Memo, April 24, 2012            Cover Memo
Board Order                                                              Board Order
Order Exhibit A                                                       Exhibit A
Attachment 2                                                           Public Comments
Attachment 3                                                           RAC Minutes for January, February,and March 2012
Attachment 4                                                            RAC response letters

For additional information on the CIP process or questions related to the above doucments , please contact Shashi Bajracharya at Engineering and Construction Services Division. His contact information is given below.

Phone: (541) 682-6932
Email:  shashi.bajracharya@co.lane.or.us
Fax:       Attention CIP13-17 
                Lane County Public Works
                3040 N Delta Highway
                Eugene, OR 97408
                                              
                



Update: March 19, 2012
Public Comments and RAC Meeting Update

The Roads Advisory Committee (RAC) is scheduled to meet  and deliberate on the draft CIP on March 28, 2012. As of March 16, 2012, seven written comments were received. RAC heard a testimony at the public hearing held on February 22, 2012. The received public comments have been forwarded to the RAC. The complete RAC packet can be viewed by clicking the links below.

<><><><><><><><><><><><><><><><>
 Document

  RAC March Memo

 Attachment 1:  

  Willamalane Parks and Recreation District

 Attachment 2:   

 Hunsaker Ln-Beaver St Bike Ped Connection 

 Attachment 3a:   30th Avenue Overlay-Robert Thompson
 Attachment 3b:   30th Avenue Overlay-Jennifer Hayward                                            
 Attachment 3c:  30th Avenue Overlay- Addison McMillan
 Attachment 3d:  30th Avenue Overlay-ASLCC, Michael Friedman
 Attachment 3e:  30th Avenue Overlay- LCC
 Attachment 4:  City of Springfield

Staff will request the RAC for a recommendation on the Draft, which will be forwarded to the Board of County Commissioners for adoption in May 2012. The BCC is tentatively scheduled for the second public hearing on May 9, 2012 prior to adoption. The public hearing date, time, and location  will be announced in the Register Guard and updated on this page.

For additional information on the CIP process or questions related to the individual projects or getting involved in the process, please contact Shashi Bajracharya at Eningeering and Construction Division. His contact information is given below.

 Phone: 

 (541) 682-6932

 Email:

shashi.bajracharya@co.lane.or.us

 Fax:

(541) 682-8554

 Mail:

Attention: CIP 2013-17
Lane County Public Works
3040 N Delta Highway
Eugene, OR 97408

          




Update: February 15, 2012
CIP Documents Updated

The Draft CIP has been slightly revised to reflect new information. The February RAC memo discusses these changes. Attachment 3 is a new project request received. The complete RAC packet can be accessed via the links below.

<><><><><><><><><><><><><><><><>
 Document

 RAC February Memo

 Attachment 1:  

 Executive Summary and Tables

 Attachment 2:   

Glenwood Blvd. Overlay Project Scope Update 

 Attachment 3:  Willamalane Project Request
 Enclosure  Complete updated packet




Update: February 8, 2012
Public Hearing Date and Location Information


PUBLIC HEARING NOTICE

FY 13-17 Lane County Capital Improvement Program


The Lane County Roads Advisory Committee (RAC) has scheduled a public hearing to receive testimony regarding the Draft Five-Year Lane County Public Works Capital Improvement Program Fiscal Years 2013 through 2017 (Draft CIP). This is the first of two public hearings on the matter. There will be a second notice in April or May announcing when the Board of County Commissioners will hold the second public hearing to consider the recommendation of the RAC.

 

The Draft CIP can be viewed at http://www.lanecounty.org/Departments/PW/TransPlanning/Pages/1317cip.aspx.

                        
                        DATE:            Wednesday, February 22, 2012

                        TIME:             6:30 p.m.

                        PLACE:          The Goodson Room, Operations Building

                                              Lane County Public Works, 3040 N. Delta Hwy, Eugene

 

If you have questions or need special arrangements pursuant to the Americans with Disabilities Act, please contact Shashi Bajracharya at least one week prior to the meeting, at (541) 682-6932, shashi.bajracharya@co.lane.or.us.



Update:January 26, 2012

Draft CIP 13-17 Released for Public Review

The Lane County Roads Advisory Committee(RAC) at their January 25, 2012 meeting released the Draft Lane County Capital Improvement Program Fiscal Years 2013 thru 2017 (Draft CIP) for public review in anticipation of comments / testimony at the Public Hearing scheduled for February 22, 2012. A separate notice will be posted on this page soon announcing the hearing location and time. The RAC is also accepting written comments received at the address given below. Staff will forward written comments received by March 16, 2012 to the committee which is expected to deliberate on the Draft CIP  and provide a recommendation at their March 28 meeting.

The released documents can be accessed via the links below. The RAC memo provides a brief overview of the CIP. Attachment 1 to the memo is the Executive Summary and tables showing Road Fund allocations and construction schedule. Attachment 2 is the Prioritization Matrix tool discussed in the memo. Attachment 3 provides detailed project information such as project scope, cost, funding sources  for each project listed in Attachment 1.

 Document :  RAC Memo 
 Attachment 1:  Executive Summary and Tables
 Attachment 2:       Prioritization Matrix
 Attachment 3:  Project Information Sheets (Individual Projects are listed below)


Hyacinth Street                                   BSP / Mt. Vernon Pedestrian Safety       Pengra Covered Bridge 
Schindler Landing  Wayside  Belknap Covered Bridge Office Covered Bridge
Layng Covered Bridge 30th Avenue Overlay Wildcat Covered Bridge
Glenwood Boulevard Repaving 30th Avenue/Gonyea Interchange Unity Covered Bridge

 


Update: December 15, 2011

 

 

 

 

 

 

 

CIP Kickoff Meeting

The Lane County  Engineering and Construction Service Division  and Transportation Planning Division  (TP) staffs discussed the Capital Improvement Program (CIP)  FY 2013-17 scope on December 14, 2011. TP staff received the general direction at the kickoff meeting and prepared a draft CIP 2013-17. Staff will present a draft to the Roads Advisory Committee (RAC) at their January 25, 2012 meeting.